Collected some examples for someone else and thought I would post some here to help some member in the future.
Attaching location may be based on shift/worker assigned to the task rather than time period
0R05H1148xx0R01F1167xx 0R04H1552xx0R01L1577xx Attaching screw appears to have been replaced